Construction Update 05-26-2018

May 26th, 2018 by
New-Facility-Update

Hope everyone had a nice Memorial Day Weekend! Last week, interior framing took place allowing electrical and plumbing wall rough-ins to push forward. The shop structure was completed, opening up that space for interior work to begin. Drone images from early last week show the exterior building shell progressing with exterior framing and parapet walls…

Posted in New Facility

Construction Update 05/19/2018

May 19th, 2018 by
Construction-Update-May

The exterior framing has been installed across the front of the building while mechanical, electrical, and plumbing rough-ins continue, and block work nears completion. The exterior framing really showcases the unique curved facade that wraps around the entire front elevation of this building. With the framing complete for the roof parapet walls, the roof system…

Posted in New Facility

Construction Update 05/12/2018

May 12th, 2018 by
0512-Update-4

The structure of the building is really taking shape with the majority of the steel and roof decking installed on the front elevation. The roof joist installation at the showroom was completed, followed by roof decking installation. A safety stand down event was held onsite to reinforce the importance of site safety with a focus…

Posted in New Facility

Construction Update 05/05/2018

May 7th, 2018 by
0505-Update1

The steel and block structure continue to push along, HVAC ductwork installation is progressing, and roofing should begin in a few weeks. Structural steel installation continues with the front half of the building nearing completion. Masonry block work was completed for the service drive area and continues at the upstairs parts area and the shop….

Posted in New Facility

Construction Update 04/28/2018

April 28th, 2018 by
0428-Update3

Rain made for a slow start to the week but the steel and block structure along with the mechanical and electrical rough-ins pushed on. April showers graced us with their presence again the first part of the week, flooding the site with several inches of standing water. But the sun came out and allowed the…

Posted in New Facility

Construction Update 04/21/2018

April 21st, 2018 by
0421-Update5

The second-floor slab was prepped, inspected, and poured this week. Block and structural steel continue to make progress on the building structure while mechanical, electrical, and plumbing work to get a jump start on overhead rough-ins. Drone photo shows the progress of the block work, structural steel, and recent 2nd floor slab pour. Welders installed…

Posted in New Facility

Construction Update 04/14/2018

April 14th, 2018 by
0414-ConstructionUpdate3

Steel and masonry raced to see who will cross the finish line first! Representatives from Porsche Cars North America visited the site to check on progress. The structural steel for the second floor has been erected and steel decking has been installed. Steel decking has been welded to the beams and nelson studs will be…

Posted in New Facility

Construction Update 04/07/2018

April 7th, 2018 by
0407-Update4

Structural steel erection began this week while the mason’s continued to make progress on the block walls. Overview of the current progress of the structure shows masonry continuing to increase in height with structural steel making good progress as well. Steel beams have been set in the load bearing masonry beam pockets. Steel decking installation…

Posted in New Facility

Construction Update 03/31/2018

March 31st, 2018 by
0331-Update1

Block walls continued to be installed, embed plates were set, and structural steel began arriving, readying the site for steel erection this upcoming week. Masonry walls continued gaining in height in the phase 1 areas. Embed plates were set in place allowing structural steel erection to begin today. Rebar continued to be installed to tie…

Posted in New Facility

Construction Update 03/24/2018

March 24th, 2018 by
0324-Update2

Block walls continue to grow higher in the air allowing structural steel to begin installation next week. Masonry walls for the office areas are close to reaching 1st floor bearing height, which will allow structural steel to begin next week. Electrical boxes and conduits for outlets, switches, and wall devices continue to be installed in…

Posted in New Facility
Saved
Saved Vehicles ×

SAVED VEHICLES

You don't have any saved vehicles!

Look for this link on your favorites:

Save

Once you've saved some vehicles, you can view them here at any time.

Contact
Contact Us ×

(843) 628-2534

Call Now

1515 Savannah Highway • Charleston, SC 29407

Get Directions

Today's Hours:

Open Today! Sales: 1pm-5pm

Service: Closed

Parts: Closed

Porsche Charleston

1515 Savannah Highway Charleston, SC

Phone: (843) 628-2534

http://maps.google.com/?q=1515%20Savannah%20Highway%2C%20Charleston%2C%20SC%2029407

Parts

Phone: (843) 996-1454

1515 Savannah Highway Charleston, SC

Sales

Phone: (843) 996-1452

1515 Savannah Highway Charleston, SC

Service

Phone: (843) 996-1453

1515 Savannah Highway Charleston, SC

Collision Center

Phone: (843) 779-1051

1515 Savannah Highway Charleston, SC
32.784934 -80.005188
[schema type="organization" orgtype="LocalBusiness" url="www.porschecharleston.com" name="Porsche Charleston" description="" street="1515 Savannah Highway" city="Charleston" state="SC" postalcode="29407" country="US" email="jmarino@bakermotorcompany.com; service@bakermotorcompany.com" phone="(843) 628-2534" logo="https://di-uploads-pod15.dealerinspire.com/porschecharleston/uploads/2018/06/Baker_All_Stores-15_1080x720.jpg"]
Porsche Charleston
Porsche Charleston
1515 Savannah Highway
Charleston, SC, 29407 US
(843) 628-2534
https://di-uploads-pod15.dealerinspire.com/porschecharleston/uploads/2018/06/Baker_All_Stores-15_1080x720.jpg
Porsche Charleston 32.784934, -80.005188.