Construction Update 03/24/2018

March 24th, 2018 by

Block walls continue to grow higher in the air allowing structural steel to begin installation next week.


0324-Update1
Masonry walls for the office areas are close to reaching 1st floor bearing height, which will allow structural steel to begin next week.
0324-Update2
Electrical boxes and conduits for outlets, switches, and wall devices continue to be installed in sequence with the masonry walls.

0324-Update3
Glass and frames were installed in the mock-up this week, and prep work was completed making way for metal panels to be installed next.
0324-Update4
Walking the plank…an elevated maze of scaffolding is continuously adjusted to provide a working surface for the masons as the block walls grow in height.
0324-Update5
Reinforcing bars and grout fill is installed in the block walls at specified vertical and horizontal locations to provide a unified structural bond.

Upcoming Week Look Ahead:

  • Masonry block walls
  • In-wall plumbing and electrical rough-ins
  • Mockup installation
  • Structural steel erection
Posted in New Facility