The structure of the building is really taking shape with the majority of the steel and roof decking installed on the front elevation.


0512-Update-1
0512-Update-2

The roof joist installation at the showroom was completed, followed by roof decking installation.


0512-Update-3
A safety stand down event was held onsite to reinforce the importance of site safety with a focus on fall protection. Mike practiced his impeccable “Vanna White” skills while the team enjoyed pizza!
0512-Update-4
The 3D coordination model serves as the guide for the HVAC ductwork installation.

0512-Update-6
0512-Update-7

Block work was completed and roof joist were set at the second-floor parts area.


0512-Update-8

The exterior mock-up is nearing completion now that the metal panel installation has wrapped up.


Upcoming Week Look Ahead:

  • Masonry block walls
  • Structural steel erection
  • Mechanical, electrical, and plumbing rough-ins
  • Exterior framing